MAIN: 410.866.4900 | 365 EMERGENCY SERVICE: 410.866.5201

Image11

Archive

[vc_row][vc_column offset="vc_col-lg-6 vc_col-md-12"][vc_column_text] Kaiser Permanente [/vc_column_text][vc_empty_space height="4px"][vc_column_text] Kaiser Permanente North Baltimore Medical Center Lutherville – Timonium, MD Scope of Work This project consists of a new five-story freestanding mixed-use medical office / full service outpatient ambulatory care building – approximately 225,000 square feet with an adjacent 1000 +/- space parking garage. The ambulatory care building houses ambulatory surgery, procedure, interventional radiology, nuclear medicine, clinical decision units, diagnostic imaging, clinical laboratory, retail, oncology pharmacies, chemotherapy infusion, primary and specialty clinics, community center and various support areas. Mechanical systems were subcontracted to J. F. Fischer, Inc. by Whiting-Turner which include (but are not limited to) air handling systems, hydronic systems, central utility plant, plumbing, automatic temperature controls, duct systems, mechanical insulation, testing, adjusting and balancing, and commissioning. [/vc_column_text][vc_empty_space height="39px"][/vc_column][vc_column offset="vc_col-lg-6 vc_col-md-12"][vc_masonry_media_grid element_width="6" gap="10" grid_id="vc_gid:1636041530972-1074b1e2-d8e1-3" include="8207,8208,8209,8210,8211,8212,8213,8214"][/vc_column][/vc_row]

[vc_row][vc_column offset="vc_col-lg-6 vc_col-md-12"][vc_column_text] Edenwald Retirement Community [/vc_column_text][vc_empty_space height="4px"][vc_column_text]Air Handling Unit Replacement Towson, MD Scope of Work J. F. Fischer, Inc. (JFF) performed a complete refurbishment of Roof Top Units (RTU) serving numerous tenant apartments and common areas which included: supply and return fan walls, new floor coating, new drain pans and dampers, interior wall lining, variable frequency drive (VFD) control for fans, controls and humidifier. JFF replaced the rooftop ductwork that had failed with a factory built modular ductwork system with a solid PVC outer jacket to prevent future leaks. Condensing boilers were installed in the basement to serve the WSHP condenser water loop. The rebalanced system is now served by a newly rebuilt RTU. All work was performed with no tenant interruption of service.[/vc_column_text][vc_empty_space height="39px"][/vc_column][vc_column offset="vc_col-lg-6 vc_col-md-12"][vc_masonry_media_grid element_width="6" gap="10" grid_id="vc_gid:1636041690184-b588d10c-c092-8" include="8201,8202,8203"][/vc_column][/vc_row]